BLUF: Need advice on how to make sense of the cabling/splice job pictured. Would also appreciate any advice on where to go after figuring out what is happening with the cables.
I was asked to take a look at my parent's new build "network" and wiring situation. My parents have purchased a small 8 port Netgear switch and some access points and are asking me to terminate the connections and get the devices wired in.
I work in the cybersecurity space and have done networking certifications and classes, but would not classify myself anywhere close to a professional. That said, I can Google with the best and can generally wrap my head around concepts and practical implementations. Even then, I am struggling to make sense of what I am looking at and where to even start. From reading previous posts in the r/HomeNetworking sub I believe that the electrician running the cables was attempting to test all of the runs. From further reading, I was able to confirm my suspicion that this type of splicing has a plethora of issues, including degraded speed/packet loss; and that legitimate solutions exist, which do not make me immediately cringe.
A quick discussion with the builder/general contractor has led me to believe that one cable is being split/spliced to multiple connections which then run to the wall jacks and to another set of spliced cables two floors above (in some overzealous attempt to reduce cable runs?).
Can anyone make sense of what might be happening and guide me in a direction that gets me to something usable?
My initial goal was to terminate a few cables and get three access points installed. My revised goals are now to better understand the cabling/splicing, add a patch panel, and then begin the process of terminating the cables into the patch panel/keystone jacks at the wall receptacles. Any advice is greatly appreciated.
Backstory:
When my parents were building this house they asked me for my opinion on networking. I told them to do two drops for each room in addition to any TVs or other devices they may want hardwired in the future (including APs in the ceiling). I told them to do this while they still had the walls open. They "forgot" and did not remember to have this discussion until it was much later in the build. This caused a rush job which, as we can see, went about as well as expected.
Word for the Wise: the world isn't getting rid of dedicated cable runs, do them while the walls are open and consider conduit to a central location.
TLDR: Can anyone make sense of this mess and help me figure out what I am looking at and what to do next?
Edit:
Thank you to everyone who has commented already. I've got some advice to read through a second time and explain to my family. I'll be moving forward, if possible, with a patch panel or a keystone wall plate (as pictured in the comments below) based on how far back the electrician untwisted the cable drops/runs and how much extra cable that leaves me. Any extra advice is always appreciated. Happy holidays!