India pitches space co-operation in Canada defence pact talks
RISAT-1 was India's first Indigenously developed SAR satellite and after going out of commission in early 2017, it is now close to its reentry. Its lift-off mass was nearly 1,858 kg. Each of those antenna panels are 2×2 meters or 6×2 meters total.
https://en.wikipedia.org/wiki/RISAT-1
Running latest elsets through SatEvo (software) the predicted time of its reentry is coming out to be around 3 December 2026.
-----------------------------SatEvo v0.51by Alan Pickupalan@wingar.demon.co.uk-----------------------------Decay list from input file RISAT1.txt10.8 cm flux = 119.000000Elset Obj # Epoch Decay (Date)1 12017A 38248 26317.672341 26338.095638 (2026 December 4)

Plot source: https://heavens-above.com/OrbitHeight.aspx?satid=38248



GSLV-F18 / NVS-03 (aka IRNSS-1L) launched as scheduled at 18:21:00(UTC)/23:51:00(IST), 30 Oct 2026 from Second Launch Pad of SDSC-SHAR.
Live webcast: (Links will be added as they become available)
| GSLV-F18 / NVS-03 Mission Page | GSLV-F18 / NVS-03 Gallery | GSLV-F18 / NVS-03 Press kit(PDF) |
|---|
Some highlights:
Updates:
| Time of Event | Update |
|---|---|
| 13 Nov 2026 | NVS-03 reached its 111.75°E orbital slot. |
| 4 Nov 2026 | After four orbit raising burns with cumulative duration of 6164 seconds, NVS-03 has reached 35765 x 36196 km GSO with 29.98° inclination |
| Post-launch | Tracking data for 3 Nov 2026 confirms execution of third orbit raising burn. A1228 (26245A), i=29.89°, A×P=35842.58×34594.95 km |
| Post-launch | Tracking data for 2 Nov 2026 confirms execution of second orbit raising burn. A1228 (26245A), i=29.08°, A×P=37762.79×24550.64 km |
| Post-launch | Second orbit raising burn with duration of 3085.14 seconds has been successfully completed on 1 November 2026 at 18:05:16 (IST). Estimated orbit after the burn is 24691 x 37791 km. |
| Post-launch | First orbit raising burn with duration of 2174.8 seconds has been successfully completed on 31 October 2026 at 16:48 hrs (IST). Estimated orbit after the burn is 5477.6 x 37833.4 km. The satellite health is normal. |
| Post-launch | Two objects have been cataloged. A1228 ( 26245A ), i=20.71°, A×P=37895.59×178.15 km and A1229 ( 26245B ), i=20.70°, A×P=37746.07×170.70 km |
| T + 42m00s | Launch broadcast ends. |
| T + 33m00s | Dinesh Kumar Singh (Director URSC) : Solar panels of NVS-03 deployed. Will take a week to reach its slot. |
| T + 30m00s | Chairman: 170.3 x 38,080 km is the achieved orbit. |
| T + 22m35s | Chairman: NVS-03 has been injected in intended orbit. |
| T + 18m35s | NVS-03 separated! |
| T + 18m25s | CUS shut off! |
| T + 17m00s | Sticking to nominal path. |
| T + 15m35s | CUS performance nominal. |
| T + 13m45s | CUS performance nominal. |
| T + 12m30s | CUS operating at nominal thrust now. |
| T + 11m00s | CUS performance nominal. |
| T + 08m00s | CUS performance nominal. |
| T + 04m58s | GS2 separated, CUS ignited. |
| T + 04m30s | CUS authorized. |
| T + 04m00s | PLF jettisoned. |
| T + 02m40s | GS2 ignited, GS2 separated, CLG initiated. |
| T + 01m50s | S139 core burn out. |
| T minus 00m00s | S139 core ignited. Lift off! |
| T minus 00m4.8s | 4xL40H ignited. |
| T minus 03m00s | OBC in flight mode. |
| T minus 05m30s | External Power withdrawn, Flight coefficient loading complete. |
| T minus 09m30s | GS2 undergoing actuation checks. |
| T minus 11m00s | CUS undergoing actuation checks. |
| T minus 15m15s | Automatic Launch Sequence initiated. |
| T minus 17m00s | Data loggers are ON. |
| T minus 18m00s | Weather is Go. Mission Director has authorized the launch. |
| T minus 19m00s | NVS-03 is polled ready. LV in external hold mode. |
| T minus 20m00s | Polling now, TT&C, Vehicle, Range are go. |
| T minus 24m00s | Now showing vehicle integration process. |
| T minus 29m00s | Official stream is live! |
| T minus 24h00m | Twenty four hour long countdown commenced. |
| 28 Oct 2026 | Mission Readiness Review was held. Most recent NOTAM suggests launch is authorized. |
| 26 Oct 2026 | Time of launch officially confirmed for 11:51 (IST), 30 Oct 2026 |
| 23 Oct 2026 | NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 30 October 2026 |
| 29 Sep 2026 | NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 13 October 2026. |
| 14 Sep 2026 | GSLV-F18 / NVS-03 launch campaign began. |
Primary Payload:
NVS-03 (aka IRNSS-1L) (~2250 kg) : NVS-03 is a second-generation satellite for NavIC constellation for regional navigation and timing services.
Similar to first generation satellites it will have navigation payloads in L5 & S bands and ranging payload in C-band. But additionally, it will have a new interoperable civil signal in L1 band as well.[1] [2]
Like NVS-01 and NVS-02 it is expected to carry only one indigenous Rubidium based atomic clock (iRAFS) developed by Space Applications Centre (SAC) out of four in total, other three being procured. [3] [4] [5]
NVS-03 is third of the five satellites (NVS-01, 02, 03, 04 & 05) planned to replace the aging first generation satellites that faced problems with their malfunctioning atomic clocks. Initially these second generation satellites were meant to expand upon existing NaVIC constellation [6] [7] but due to setback from failures of imported clocks on many first generation satellites, they will now only serve as replacement to existing fleet. At present only three out of eight NavIC satellites (IRNSS-1B, 1I and NVS-01) remain functional to provide PNT services. [8] Note that four satellites is the minimum amount needed for NavIC PNT services to be functional.
ISRO has sought approval of three more navigation satellites under NavIC Phase-3 to maintain the base layer of seven satellites. Eventually NavIC constellation can be expanded from 7 to 11 satellites which will increase the service area from 1500 km to 3000 km beyond Indian territory.
For Global Indian Navigation System (GINS), ISRO is awaiting approval of twelve satellites initially to be placed in the Medium Earth Orbit (MEO). While about 24 to 30 satellites would be needed in total. [9] [10]
r/ISRO • u/ryuKEN-19 • 18h ago
Title
Last week, we held the workshop “Discussion on Characterization of the Lunar Polar Volatiles and Landing Site Candidates for Volatile Exploration Missions.”
Researchers and engineers from ISRO, JAXA, ESA, and NASA gathered to discuss the characterization of lunar polar volatiles and potential landing site candidates for future volatile exploration missions.
The workshop also provided a valuable opportunity for members of the ISRO-JAXA Joint ODCT to meet in person for the first time and exchange perspectives on lunar polar science and exploration.
The group photo includes Joint ODCT members together with students, researchers, and leadership from PRL, reflecting the broad collaboration supporting future lunar exploration activities.
It was a productive and inspiring discussion, highlighting the importance of international cooperation in advancing our understanding of the Moon’s polar regions.
r/ISRO • u/swasthikvisakh • 3d ago
Applications are open for January 2027 PhD positions in Astrophysics at the Department of Earth and Space Sciences, IIST Thiruvananthapuram:
r/ISRO • u/Low_Difficulty7225 • 4d ago
I wanted to know about the joining as i didn't get any mail till now, what are job locations for civil, career prospects and work culture. If anyone working there as civil engg please feel free to connect.
r/ISRO • u/anshumaanps • 6d ago
Preparations for the first unmanned flight (G-1) of India's first human space mission 'Gaganyaan' are in the final stages. Union Minister Dr. Jitendra Singh told Bhaskar on Wednesday that Gaganyaan is set to be launched in late December or early January 2027.
r/ISRO • u/totaldisasterallthis • 6d ago
Crafty Moon-craft is available worldwide, and the Ebook version is free for everyone. Details & download at https://jatan.space/crafty-moon-craft-book/
r/ISRO • u/Independent-Sun8266 • 6d ago
I am a dual degree student at iit kgp. My branch is manufacturing science and engineering ( its a sub branch of mechanical engineering) with integrated mtech in industrial engineering. Can i give gate and later icrb to join isro?
r/ISRO • u/japanese-sushi- • 7d ago
Can a BTech graduate who joined as Scientist C opt for higher studies after 3 years of service ?
Like paid leaves or similar options ?
What’s the criteria and chances of leave being approved in centres like VSSC.
r/ISRO • u/alpachinohacks • 9d ago
I heard a rumour that ISRO started recruiting civilians through internals channels for the Gaganyaan program. Has anyone heard about it ? I dont know how much of it is true. But putting it out here to see if anyone has any information on this.
r/ISRO • u/shyamdotme • 10d ago
A childhood dream fulfilled.
Witness #ISRO rocket launch ✅
Liftoff Narmal !
Perfarmance Narmal !
🚀🚀🚀🚀🚀🚀
#GSLVF18 #navic #NVS03
r/ISRO • u/M084MM3D • 10d ago
I am just wondering how can India send all their rockets and probes while barely speeding any money unlike NASA and the ESA.
I spent the last year building a 205-million-parameter satellite AI model from scratch for Indian farmers.
Yesterday I published the paper, and almost nobody noticed.
Everyone in Indian tech wants to talk about LLM wrappers. Meanwhile, 86% of Indian farmers work on plots smaller than 0.4 hectares, and for 75 days every monsoon, clouds blind every optical satellite over India.
Western foundation models from NASA, IBM, and Stanford were trained on 500-hectare American monoculture grids under clear skies. When a cyclone hits Odisha or monsoon clouds cover Uttar Pradesh, those models go blind.
So at Sphitih AI, we trained Vyom 1.0 (205M) from the ground up—fusing C-band radar waves with optical time-series and soil physics:
• In Farrukhabad (UP), it pierces 91.4% monsoon cloud cover to reconstruct crystal-clear crop health at 0.892 SSIM.
• On the global Sen1Floods11 flood benchmark, it hit 75.81% Water IoU—beating NASA/IBM Prithvi (68.4%), Stanford CROMA (71.4%), and DOFA (73.5%).
• And it runs in <32 milliseconds per sq. km on a single 24GB GPU, so local district offices don't need H100 clusters.
I don't have a massive PR agency or a billion-dollar lab behind me, just verified math, a permanent Zenodo DOI, and open evaluation benchmarks.
If you work in Remote Sensing, AgriTech, ISRO/NRSC, or Indian DeepTech, I would genuinely love for you to tear apart our paper and test our benchmarks.
Link to the Zenodo paper & GitHub verification repo
Preprint (Zenodo DOI):
https://doi.org/10.5281/zenodo.24078426
Open Benchmark Repo:
https://github.com/sphitih-ai/sphitih-ai-vyom-205m-benchmarks-