r/ISRO • • 14d ago

Derelict RISAT-1 is nearing its reentry.

33 Upvotes

RISAT-1 was India's first Indigenously developed SAR satellite and after going out of commission in early 2017, it is now close to its reentry. Its lift-off mass was nearly 1,858 kg. Each of those antenna panels are 2×2 meters or 6×2 meters total.

https://en.wikipedia.org/wiki/RISAT-1

Running latest elsets through SatEvo (software) the predicted time of its reentry is coming out to be around 3 December 2026.

-----------------------------
SatEvo v0.51
by Alan Pickup
alan@wingar.demon.co.uk
-----------------------------
Decay list from input file RISAT1.txt
10.8 cm flux = 119.000000
Elset Obj # Epoch Decay (Date)
1 12017A 38248 26317.672341 26338.095638 (2026 December 4)

RISAT-1 Mean Height Decay in 2026 (via Heavens-Above)

Plot source: https://heavens-above.com/OrbitHeight.aspx?satid=38248

RISAT-1 in clean-room
RISAT-1 in on-orbit configuration
RISAT-1 in stowed configuration

r/ISRO • • 28d ago

Mission Success! GSLV-F18 / NVS-03 Mission Updates and Discussion

36 Upvotes

GSLV-F18 / NVS-03 (aka IRNSS-1L) launched as scheduled at 18:21:00(UTC)/23:51:00(IST), 30 Oct 2026 from Second Launch Pad of SDSC-SHAR.

Live webcast: (Links will be added as they become available)

GSLV-F18 / NVS-03 Mission PageGSLV-F18 / NVS-03 GalleryGSLV-F18 / NVS-03 Press kit(PDF)

Some highlights:

Updates:

Time of EventUpdate
13 Nov 2026NVS-03 reached its 111.75°E orbital slot.
4 Nov 2026After four orbit raising burns with cumulative duration of 6164 seconds, NVS-03 has reached 35765 x 36196 km GSO with 29.98° inclination
Post-launchTracking data for 3 Nov 2026 confirms execution of third orbit raising burn. A1228 (26245A), i=29.89°, A×P=35842.58×34594.95 km
Post-launchTracking data for 2 Nov 2026 confirms execution of second orbit raising burn. A1228 (26245A), i=29.08°, A×P=37762.79×24550.64 km
Post-launchSecond orbit raising burn with duration of 3085.14 seconds has been successfully completed on 1 November 2026 at 18:05:16 (IST). Estimated orbit after the burn is 24691 x 37791 km.
Post-launchFirst orbit raising burn with duration of 2174.8 seconds has been successfully completed on 31 October 2026 at 16:48 hrs (IST). Estimated orbit after the burn is 5477.6 x 37833.4 km. The satellite health is normal.
Post-launchTwo objects have been cataloged. A1228 ( 26245A ), i=20.71°, A×P=37895.59×178.15 km and A1229 ( 26245B ), i=20.70°, A×P=37746.07×170.70 km
T + 42m00sLaunch broadcast ends.
T + 33m00sDinesh Kumar Singh (Director URSC) : Solar panels of NVS-03 deployed. Will take a week to reach its slot.
T + 30m00sChairman: 170.3 x 38,080 km is the achieved orbit.
T + 22m35sChairman: NVS-03 has been injected in intended orbit.
T + 18m35sNVS-03 separated!
T + 18m25sCUS shut off!
T + 17m00sSticking to nominal path.
T + 15m35sCUS performance nominal.
T + 13m45sCUS performance nominal.
T + 12m30sCUS operating at nominal thrust now.
T + 11m00sCUS performance nominal.
T + 08m00sCUS performance nominal.
T + 04m58sGS2 separated, CUS ignited.
T + 04m30sCUS authorized.
T + 04m00sPLF jettisoned.
T + 02m40sGS2 ignited, GS2 separated, CLG initiated.
T + 01m50sS139 core burn out.
T minus 00m00sS139 core ignited. Lift off!
T minus 00m4.8s4xL40H ignited.
T minus 03m00sOBC in flight mode.
T minus 05m30sExternal Power withdrawn, Flight coefficient loading complete.
T minus 09m30sGS2 undergoing actuation checks.
T minus 11m00sCUS undergoing actuation checks.
T minus 15m15sAutomatic Launch Sequence initiated.
T minus 17m00sData loggers are ON.
T minus 18m00sWeather is Go. Mission Director has authorized the launch.
T minus 19m00sNVS-03 is polled ready. LV in external hold mode.
T minus 20m00sPolling now, TT&C, Vehicle, Range are go.
T minus 24m00sNow showing vehicle integration process.
T minus 29m00sOfficial stream is live!
T minus 24h00mTwenty four hour long countdown commenced.
28 Oct 2026Mission Readiness Review was held. Most recent NOTAM suggests launch is authorized.
26 Oct 2026Time of launch officially confirmed for 11:51 (IST), 30 Oct 2026
23 Oct 2026NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 30 October 2026
29 Sep 2026NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 13 October 2026.
14 Sep 2026GSLV-F18 / NVS-03 launch campaign began.

Primary Payload:

NVS-03 (aka IRNSS-1L) (~2250 kg) : NVS-03 is a second-generation satellite for NavIC constellation for regional navigation and timing services.

Similar to first generation satellites it will have navigation payloads in L5 & S bands and ranging payload in C-band. But additionally, it will have a new interoperable civil signal in L1 band as well.[1] [2]

Like NVS-01 and NVS-02 it is expected to carry only one indigenous Rubidium based atomic clock (iRAFS) developed by Space Applications Centre (SAC) out of four in total, other three being procured. [3] [4] [5]

  • Mass: 2,250 kg
  • Orbital slot: 111.75°E
  • Mission life: 12 years
  • Power: ~3 kW
  • Platform/Bus: I-2K

NVS-03 is third of the five satellites (NVS-01, 02, 03, 04 & 05) planned to replace the aging first generation satellites that faced problems with their malfunctioning atomic clocks. Initially these second generation satellites were meant to expand upon existing NaVIC constellation [6] [7] but due to setback from failures of imported clocks on many first generation satellites, they will now only serve as replacement to existing fleet. At present only three out of eight NavIC satellites (IRNSS-1B, 1I and NVS-01) remain functional to provide PNT services. [8] Note that four satellites is the minimum amount needed for NavIC PNT services to be functional.

ISRO has sought approval of three more navigation satellites under NavIC Phase-3 to maintain the base layer of seven satellites. Eventually NavIC constellation can be expanded from 7 to 11 satellites which will increase the service area from 1500 km to 3000 km beyond Indian territory.

For Global Indian Navigation System (GINS), ISRO is awaiting approval of twelve satellites initially to be placed in the Medium Earth Orbit (MEO). While about 24 to 30 satellites would be needed in total. [9] [10]


r/ISRO • • 3h ago

India pitches space co-operation in Canada defence pact talks

Thumbnail
spaceq.ca
15 Upvotes

r/ISRO • • 19h ago

ISRO aims to end the year with first operational launch of SSLV.

Thumbnail
indianexpress.com
29 Upvotes

r/ISRO • • 1d ago

Official webpage for Lunar Polar Exploration (LUPEX) has been updated

224 Upvotes

r/ISRO • • 1d ago

IN-SPACe to make advance payments non-refundable for rocket launches after customers pull out of upcoming SSLV launch which will now carry only two satellites weighing around 60 kg each.

Thumbnail
moneycontrol.com
51 Upvotes

r/ISRO • • 18h ago

People working at isro , how has ai impacted , and which ai models are u using?

4 Upvotes

Title


r/ISRO • • 1d ago

On PSLV-N1 maiden launch delays to early 2027, "The delays are a result of various issues such as coordination with the payload and the available launch window" said A T Ramchandani, Senior Vice-President and Head, L&T Precision Engineering & Systems.

Thumbnail
indianexpress.com
31 Upvotes

r/ISRO • • 1d ago

Lunar Polar Exploration@JAXA(LUPEX on X: "Last week, we held the workshop “Discussion on Characterization of the Lunar Polar Volatiles and Landing Site Candidates for Volatile Exploration Missions” with researchers and engineers from ISRO, JAXA, ESA, and NASA.

Thumbnail x.com
12 Upvotes

Last week, we held the workshop “Discussion on Characterization of the Lunar Polar Volatiles and Landing Site Candidates for Volatile Exploration Missions.”
Researchers and engineers from ISRO, JAXA, ESA, and NASA gathered to discuss the characterization of lunar polar volatiles and potential landing site candidates for future volatile exploration missions.
The workshop also provided a valuable opportunity for members of the ISRO-JAXA Joint ODCT to meet in person for the first time and exchange perspectives on lunar polar science and exploration.
The group photo includes Joint ODCT members together with students, researchers, and leadership from PRL, reflecting the broad collaboration supporting future lunar exploration activities.
It was a productive and inspiring discussion, highlighting the importance of international cooperation in advancing our understanding of the Moon’s polar regions.


r/ISRO • • 1d ago

OrbitAID plans on-orbit satellite refueling demonstration in December and a commercial mission by end-2027

Thumbnail
business-standard.com
12 Upvotes

r/ISRO • • 3d ago

Official IN-SPACe Announcement of Opportunity for making available Indian Orbital Resources at 93.5°E to the Non-Government Entities

Thumbnail inspace.gov.in
17 Upvotes

r/ISRO • • 3d ago

PhD Positions in Astrophysics (Jan 2027 Intake) at IIST Thiruvananthapuram – Galaxies/CGM, JWST Exoplanets, and GRBs/Radio Transients (Deadline: 1 Dec 2026)

Thumbnail
gallery
12 Upvotes

Applications are open for January 2027 PhD positions in Astrophysics at the Department of Earth and Space Sciences, IIST Thiruvananthapuram:

  • Position 1 (Code PES01 – Prof. Anand Narayanan): Connecting Galaxies to Their Gaseous Environments (CGM/IGM) OR Studying Exoplanet Atmospheres with JWST (Requires valid CSIR/UGC-NET, NBHM, JEST, or GATE score)
  • Position 2 (Code EES02 – Prof. Resmi Lekshmi): Catching Cosmic Explosions — GRBs, gravitational-wave counterparts, TDEs, and radio transients (Open to CSIR/UGC JRF holders)
  • Fellowship: ₹37,000/month (JRF) | ₹42,000/month (SRF after review)
  • Last Date to Apply: 1 December 2026 (23:59 hrs)
  • Apply Online:https://admission.iist.ac.in

r/ISRO • • 4d ago

Got selected as a Scientist SC in civil.

22 Upvotes

I wanted to know about the joining as i didn't get any mail till now, what are job locations for civil, career prospects and work culture. If anyone working there as civil engg please feel free to connect.


r/ISRO • • 5d ago

Gaganyaan G1 delayed again: First uncrewed launch unlikely before February 2027

Thumbnail
indiatoday.in
84 Upvotes

r/ISRO • • 6d ago

Chandrayaan-3 finds 3 distinct layers in Moon's soil

Thumbnail
timesofindia.indiatimes.com
53 Upvotes

r/ISRO • • 6d ago

Gaganyaan is set to be launched in late December or early January 2027

43 Upvotes

Preparations for the first unmanned flight (G-1) of India's first human space mission 'Gaganyaan' are in the final stages. Union Minister Dr. Jitendra Singh told Bhaskar on Wednesday that Gaganyaan is set to be launched in late December or early January 2027.

Source!


r/ISRO • • 6d ago

New (free) book launch: Crafty Moon-craft, showcasing unique slices of creativity in lunar exploration by India’s Chandrayaan missions 🌙

Post image
29 Upvotes

Crafty Moon-craft is available worldwide, and the Ebook version is free for everyone. Details & download at https://jatan.space/crafty-moon-craft-book/


r/ISRO • • 6d ago

Confused about the Eligibility criteria for scientist at isro.

4 Upvotes

I am a dual degree student at iit kgp. My branch is manufacturing science and engineering ( its a sub branch of mechanical engineering) with integrated mtech in industrial engineering. Can i give gate and later icrb to join isro?


r/ISRO • • 7d ago

Masters After Joining

10 Upvotes

Can a BTech graduate who joined as Scientist C opt for higher studies after 3 years of service ?

Like paid leaves or similar options ?

What’s the criteria and chances of leave being approved in centres like VSSC.


r/ISRO • • 9d ago

Jio begins talks with ISRO, Skyroot Aerospace and other homegrown companies amid satellite launch prep

Thumbnail hindustantimes.com
85 Upvotes

r/ISRO • • 9d ago

Has ISRO Started recruiting civilian astronauts through internal channels ?

7 Upvotes

I heard a rumour that ISRO started recruiting civilians through internals channels for the Gaganyaan program. Has anyone heard about it ? I dont know how much of it is true. But putting it out here to see if anyone has any information on this.


r/ISRO • • 10d ago

Original Content Witnessed the launch of NVS-03

505 Upvotes

A childhood dream fulfilled.

Witness #ISRO rocket launch ✅

Liftoff Narmal !

Perfarmance Narmal !

🚀🚀🚀🚀🚀🚀

#GSLVF18 #navic #NVS03


r/ISRO • • 10d ago

Deep-ocean submersible Matsya-6000’s 500-m trial dive in early 2027. It would be a significant step towards India’s push to send a crewed vehicle to a depth of 6,000 metres under Samudrayaan Project

Thumbnail
thehindu.com
59 Upvotes

r/ISRO • • 10d ago

How is the ISRO costs so little money compared to other space programs >

10 Upvotes

I am just wondering how can India send all their rockets and probes while barely speeding any money unlike NASA and the ESA.


r/ISRO • • 12d ago

Built Indian Foundational Model for Geospatial Intelligence to enhance agriculture

Post image
112 Upvotes

I spent the last year building a 205-million-parameter satellite AI model from scratch for Indian farmers.

Yesterday I published the paper, and almost nobody noticed.

Everyone in Indian tech wants to talk about LLM wrappers. Meanwhile, 86% of Indian farmers work on plots smaller than 0.4 hectares, and for 75 days every monsoon, clouds blind every optical satellite over India.

Western foundation models from NASA, IBM, and Stanford were trained on 500-hectare American monoculture grids under clear skies. When a cyclone hits Odisha or monsoon clouds cover Uttar Pradesh, those models go blind.

So at Sphitih AI, we trained Vyom 1.0 (205M) from the ground up—fusing C-band radar waves with optical time-series and soil physics:

• In Farrukhabad (UP), it pierces 91.4% monsoon cloud cover to reconstruct crystal-clear crop health at 0.892 SSIM.

• On the global Sen1Floods11 flood benchmark, it hit 75.81% Water IoU—beating NASA/IBM Prithvi (68.4%), Stanford CROMA (71.4%), and DOFA (73.5%).

• And it runs in <32 milliseconds per sq. km on a single 24GB GPU, so local district offices don't need H100 clusters.

I don't have a massive PR agency or a billion-dollar lab behind me, just verified math, a permanent Zenodo DOI, and open evaluation benchmarks.

If you work in Remote Sensing, AgriTech, ISRO/NRSC, or Indian DeepTech, I would genuinely love for you to tear apart our paper and test our benchmarks.

Link to the Zenodo paper & GitHub verification repo

Preprint (Zenodo DOI):

https://doi.org/10.5281/zenodo.24078426

Open Benchmark Repo:

https://github.com/sphitih-ai/sphitih-ai-vyom-205m-benchmarks-