r/NuclearPower • • Sep 02 '26

Nuclear Specialist Job Opening

Thumbnail careers-nrdc.icims.com
5 Upvotes

The Natural Resource Defense Council (NRDC) is looking for a Nuclear Specialist to work with their Science and Climate & Energy teams in Washington, DC

To support NRDC's advocacy, the Nuclear Specialist will conduct technical and policy analysis on nuclear energy issues including those related to complex reactor safety, radiation protection, and nuclear waste. Working within the Policy Analysis division in the Science Office and the Power division in Climate & Energy Department, the Nuclear Specialist will be a core staff member at NRDC for the institution’s engagement on nuclear power in the context of climate change. While NRDC prioritizes clean energy solutions including wind, solar, storage, efficiency and transmission, we recognize that nuclear power is zero-carbon generation and support its use in the right circumstances taking into account safety, community acceptance, and environmental impacts. The Specialist will contribute analysis and comments to federal and state regulatory proceedings, advise policymakers, and monitor nuclear developments to inform NRDC’s engagement.  


r/NuclearPower • • Mar 11 '26 Popcorn

Proximity to nuclear power plants associated with increased cancer mortality

Thumbnail
hsph.harvard.edu
0 Upvotes

r/NuclearPower • • 1h ago

Global operable nuclear capacity reaches an all-time high of 401.2 GW across 443 reactors (Reactor Atlas data, Oct 2026)

Post image
15 Upvotes

I compiled worldwide operable nuclear capacity by year from the Reactor Atlas dataset (net capacity, data as of 13 October 2026).

The current total is 401.2 GW across 443 reactors, the highest ever recorded. The previous peak was 396.1 GW in 2018, with 447 reactors.

Between 1990 and 2015 capacity grew from 330.5 to 380.9 GW, about 50 GW in 25 years.

Between 2016 and 2026 China went from 31.6 to 60.9 GW, an increase of 29.3 GW. The world as a whole grew 11.3 GW net in the same period, as Germany (10.8 GW), Japan (8.3 GW) and Taiwan (5.1 GW) reduced capacity.

If the reactors under construction connect on their announced dates, capacity would reach 461.9 GW across 538 reactors in 2031, 15% above today. This projection does not subtract future closures.

Notes: "operable" includes temporarily stopped units, about 22 GW, mostly in Japan, which is the World Nuclear Association convention. Excluding them, the 2026 figure is about 379 GW. For units that entered commercial operation between 2016 and 2026, the median construction time was 8.6 years: 5.8 in China and 10.3 elsewhere.

https://reactoratlas.com/en/year/2026


r/NuclearPower • • 22h ago

Aecon permanent Project Coordinator vs Bruce Power contract position?

3 Upvotes

I’m starting a permanent Project Coordinator position with Aecon at the end of this month, but I also received an interview for a contract Project Coordinator role at Bruce Power.

I’m confused because I’ve been told Bruce Power contract positions are usually through companies like Tundra or Fermi. However, my interview came directly from Bruce Power HR and the technical interview is with the Bruce Power team. Is this normal? Does Bruce Power select you first and then hire you through a contract company?

If I get the offer, would you choose the permanent Aecon position or the Bruce Power contract position?

I’m early in my career, so even though the contract may pay much more, I’m wondering about job security, benefits, contract length, overtime, and the chances of extension.


r/NuclearPower • • 23h ago

Did anyone receive the Bruce security clearance recently? Please share your timline. Thank you

1 Upvotes

r/NuclearPower • • 1d ago

POSS/C Test

0 Upvotes

Does anyone know what Duke Energy's qualifying POSS/C score is for Nuclear Operations? Specifically, is there a minimum required score for Mathematical Usage, or is the overall score what matters?


r/NuclearPower • • 2d ago

ITER vs SPARC vs TAE vs China: Who Gets Fusion First?

Thumbnail
youtube.com
4 Upvotes

r/NuclearPower • • 3d ago

Trump promise of hundreds of thousands of nuclear jobs doesn’t add up

Thumbnail
alternet.org
0 Upvotes

r/NuclearPower • • 4d ago

Nuclear background check

8 Upvotes

I’m going to be doing the nuclear badging process relatively soon for unescorted access for a job offer I accepted.

Back in 2015 I was convicted of two battery charges the same day both misdemeanor.

Will this disqualify me from getting access then my job offer rescinded? My record has been clean since that conviction and I completed all the court ordered classes and such.

Thank you


r/NuclearPower • • 4d ago

Why can’t a proven nuclear reactor design simply be built anywhere?

4 Upvotes

I came across an interesting point about how a proven reactor design can still need changes depending on where it is built.

Things like seismic conditions, cooling water, local regulations and the site itself can all affect the final design.

How much can these site-specific requirements change a reactor project in practice? And which site-related issue tends to be the most difficult to deal with?


r/NuclearPower • • 4d ago

Assessment for OPG

10 Upvotes

Has anyone got assessment for NOIT for OPG today. I just wanted to ask how is it and what do they check during assessment before starting it. Thank you in advance


r/NuclearPower • • 5d ago

TEPCO Postpones The Completion of K-K Unit 7 Anti-Terrorism Measures by One Year to Aug. 2030.

Thumbnail
asahi.com
4 Upvotes

The new regulation stipulated by the Japanese NRA requires that every reactor that has been restarted must implement anti-terrorism measures, five years after the final NRA approval. K-K 7 remains in shutdown as that deadline was March 2025, but K-K 6 deadline is April 2029. Unit 6 is the sole unit that’s operating as of today.

Earlier this year. TEPCO agreed to send unit 1 and 2 into decomm, which is a prerequisite for obtaining local consent for restarting unit 6 and 7. In the future, unit 3 might also be decommissioned to pave the way for restarting unit 4 and 5.


r/NuclearPower • • 5d ago

Nuclear Trivia Thursday Again.

5 Upvotes

What's the only Commercial Nuclear Power Plant on Route 66 in US?

Could be Palo Verde. Nope

Could be Wolf Creek. Nope

Could be Calloway. Nope

Could be Braidwood. Yup. If you drive down Route 66 in Braidwood, IL (now known as IL-53) you'll see the plant from the road.


r/NuclearPower • • 6d ago

Hochul unveils 5-gigawatt nuclear master plan for New York

Thumbnail
news10.com
54 Upvotes

r/NuclearPower • • 6d ago

Why is building a nuclear plant so difficult even after the reactor design is proven?

3 Upvotes

Something I’ve been wondering about is how much of the challenge comes after the actual reactor design has been worked out.

Even if the reactor technology is well understood, there are still things like construction, supply chains, quality control, testing, licensing, and commissioning to deal with.

Which part tends to cause the biggest problems in real nuclear projects? Is it mainly the construction side, or are there usually unexpected technical issues during testing and commissioning?


r/NuclearPower • • 5d ago

Why does a nuclear power plant need diesel generators?

0 Upvotes

Why does a nuclear POWER plant need a diesel generator to supply it with power? Can't it use it's own power generation to power itself? Can a Nuclear power plant go cold? I thought they work by having decaying atomic fuel heat water and that drives power turbines. Does nuclear fuel stop decaying?


r/NuclearPower • • 6d ago

Newsweek: Map Shows New Nuclear Reactors Being Built Across the US

Thumbnail
newsweek.com
15 Upvotes

Pretty cool map showing advanced reactor announcements in the US.


r/NuclearPower • • 6d ago

Samsung taps compact marine reactor for world’s first nuclear-powered LNG vessel

Thumbnail
interestingengineering.com
21 Upvotes

r/NuclearPower • • 7d ago

Asia's nuclear generation rose 439 TWh between 2015 and 2024, per Ember data

Post image
26 Upvotes

I calculated the change in nuclear generation by country between 2015 and 2024 using Ember data.

Asia's annual nuclear generation increased by 439 TWh over that period. For comparison, France's entire nuclear fleet generated 381 TWh in 2024.

By country: China +280 TWh (172 to 451), Japan +80 (4.5 to 85), UAE +41 (0 to 41), South Korea +24, Pakistan +19 (4 to 23), India +16, Iran +4 and Taiwan minus 24. China alone accounts for about 64% of Asia's net increase.

Japan's increase comes from reactors restarted after Fukushima, not from new units. Excluding Japan, the net increase is 359 TWh, slightly below France's 2024 output.

Method: TWh calculated as nuclear share times total generation, Ember data, gross basis, calendar years. I used 2024 because Ember has no 2025 data for the UAE yet. Asia here includes Iran, Taiwan and Armenia, and excludes Russia and Türkiye.

https://reactoratlas.com/en/country/cn


r/NuclearPower • • 6d ago

POSS/MASS TEST

1 Upvotes

I have the Mass and Poss eei test in about a week any advice??


r/NuclearPower • • 6d ago

Please give a step by step how to get NLO position? I have a four year biology degree.

2 Upvotes

Might be looking for a nuclear plant o license position. Any guidance is much appreciated. i have no experience, but do have a stem undergrad and am getting a masters in software engineering starting in Jan 2027. I tried searching for jobs under the NLO title couldnt find any. ANy help is much appreciated.


r/NuclearPower • • 6d ago

People who entered nuclear engineering with a science undergrad in Canada, what were your stats? And was it hard or easy to get into?

4 Upvotes

Also what universities did you guys apply to?


r/NuclearPower • • 7d ago

Anyone have any contacts with hiring managers for any New Brunswick, Canada plants?

2 Upvotes

I've tried poking around before and never got an email back or anything.

American, Nuke Ops Instructor.


r/NuclearPower • • 7d ago

Field help?

2 Upvotes

Good morning/afternoon everyone. Is there anyone willing to DM me or I DM them in the field? I am trying to enter this field and just want to pick someone's brain about it and ask questions and just learn what I need to do to become more competitive when I ETS in 16 or so months.