r/projectmanagement • • Oct 14 '26

Another message from r/projectmanagement global headquarters

73 Upvotes

Good day PMs and PM adjacent people,

TL;DR: Every thing is fine, opportunity

There have been some changes here at r/projectmanagement and r/PMCareers of late. Some have been apparent including the recent community inclusive modification of rules and some more subtle including long time top moderator u/moochao stepping down due to other demands in his life. Fellow moderator u/MattyFettuccine has asked me to take the lead.

Reddit is making changes we're trying to protect our communities from, most especially AI and other robots making removal and ban decisions. We're keeping those at bay. They're retiring long standing moderation tools with replacements not yet ready for prime time. We're keeping up.

Please read the rules. On desktop they are in the sidebar. On mobile touch ... in upper right and then 'Learn about this community.'

If you see a post or comment that you think violates our rules, please use our report button. We may or may not agree with you but we value every report. You may not see how we respond explicitly.

Matty and I have a goal to bring two more moderators on board. Moderators are volunteers with lives, work, and other hobbies. Spreading the load is good management. There is simple training and coaching. I moderate seven subs with over 2M members. Scar tissue will be shared! *grin*

We encourage discussion about what moderation means, probably both less and more than you think. We're catching up on documentation in the process. This is by no means a crisis. Plenty of time to ask questions in this thread. Good discussion will help with documentation going forward.

CPI and SPI are 1.0. Management reserve is protected.


r/projectmanagement • • Sep 25 '26

Discussion Discussion about r/projectmanagement rules

30 Upvotes

Good day PMs.

The mods have put together some adjustments to the rules for our sub. Before we roll them out we'd like to get input from the community at large.

The goal here is fewer, simpler rules that cover all the ground of the current rules and provide more room for human mod discretion. The current rules are in the sidebar on desktop. On moble touch the ... menu upper right and then 'Learn about community.'

Our experience is that rules that are too specific leave cracks and armchair lawyers pick at them and look for excuses for posts and comments that aren't appropriate. The basic structure is:

  1. Be nice, or else
  2. Stay on topic
  3. No spam or promotion

Our rules with comments in italics followed by our recommendation.

Following is our recommendation.

  1. Be Civil, Be Professional, and Engage in Good Faith

This is "be nice, or else."

If you wouldn't say it to someone on your project team, it doesn't belong on this sub. This includes being nice, not discussing politics, and encouraging healthy conversations or debate. Bigots & hate speech have a zero tolerance policy. A good rule of thumb is to follow Reddiquette.

No AI-generated content. We expect our members to aim for a genuine experience when interacting with the community, so no AI-generated content (both posts and comments) will be allowed. Exceptions may be permitted at the Mod Team’s discretion e.g. people for whom English is not a strength.

2. Project Management Topics Only

This is on topic.

Keep submissions and discussion limited to professional project management topics only.

Mod discretion may be used to remove posts that are not deemed to be related to the topic or theme of the sub.

Search the sub before you post a common question such as "what PM software should you use?"

Career related questions may be removed by mods. They can be re-asked over at r/PMcareers.

This includes, but is not limited to:

• getting my first PM role
• transitioning industries
• salary questions
• resume/interview advice
• what certification should I get

If your post is a commonly asked question, such as transitioning to PM, basic career questions, etc., it is likely to be removed.

Your homework or interview is an assessment of your skills, not ours. There are tactful ways to address assignments but if your post says 'my interview/homework scenario is XYZ, what would you do' it will be removed.

3. No Promotion / Advertising / Soliciting / Monetization / SPAM

This is no promotion.

The subreddit moderators can remove content they deem self-promotion, advertising, or solicitation.

This policy applies to references or links to websites, blogs, videos, tools, services, surveys, calls, or social media.

Market research and requirements definition are promotion.

If you have any questions about this policy, please contact the moderators via Modmail.

No Spam of any kind.

---------------------

Comments are welcome before we move forward. You can expect r/PMCareers to follow suit.


r/projectmanagement • • 4h ago

Discussion Returning to PM with AI

11 Upvotes

Hey all - after about 5 years away, I’m returning to a PM job. I was wondering how you’re leveraging AI to support your daily work? It didn’t exist in my organization at the time of my last PM job, and now we have full integration of copilot. I start at the end of December, and I am starting to think about how I can build it into the projects I’ll support. For context, my primary focus next year will be new hospital activation.


r/projectmanagement • • 1h ago

Project Management for a move - keeping it professional & not personal

2 Upvotes

This could fit into relationship advice, but what I really need are “my people” (fellow PMs) to give me a pep talk on using my project management skills to help my mom move. It somehow feels more complicated in my head. I’m used to pouring myself into my jobs (that is a different problem!), so I’m accustomed to feeling passionate about my projects. However, I’m ultimately not the client or a key stakeholder so if a client wants to do something I don’t recommend, it’s just a job & I let it go. I can document it or share with someone, but at the end of the day it’s their choice.

I can somewhat hear my own pep talk in writing this, but my emotions & personal connection are truly clouding my thoughts.

Please help me get my head right for this project!


r/projectmanagement • • 1d ago

Why the hell are we still running projects in Excel?

153 Upvotes

I'm exhausted with spreadsheet project management. Let me set some context: I get why Excel exists. It's on every laptop. Everyone knows how to use it. It's free-ish. Fine. I'm not saying burn it.

But we're in 2026 and I am STILL getting handed "the project plan" as an .xlsx file with 14 tabs, merged cells everywhere, and a color-coding system that only makes sense to the guy who built it and he left in March.

There are tools now for basically every kind of team. Construction, agencies, engineering, software, PMOs, whatever. Gantt charts that actually reschedule when something moves. Workload views that show you someone's drowning across three projects. Dependencies that don't break when somebody inserts a row. Stuff built specifically for the way different industries actually work.

And yet. Excel.

So now every Monday is a forensic investigation. Which version is current? "Plan_FINAL_v3_updated" or "Plan_FINAL_v3_updated_JM"? Why is this formula returning #REF? Who overwrote the dates in column G? Why does the "% complete" column say 80% on a task nobody has touched in three weeks?

And the dependencies. THERE ARE NO DEPENDENCIES. There's just a guy who remembers that task 14 can't start until task 9 finishes, and if that guy is on vacation, good luck.

And leadership is happy because we have a plan. They don't know the plan is a static snapshot that was out of date the moment someone hit save.

The best part is when you suggest an actual tool and someone says Excel is flexible. Yeah. So flexible that every project is tracked in a completely different made-up format. So flexible nobody can ever compare anything. So flexible that the whole thing falls apart the second the one person who understands it isn't in the room.

I'm not even asking for anything fancy. Just something that updates itself when reality changes, so I can stop being a full-time spreadsheet archaeologist.


r/projectmanagement • • 1d ago

Senior guy on my team gave notice (6 weeks left). How do I make sure we won't be calling him for help in 3 months?

17 Upvotes

i manage a small ops/reporting team and one of my senior people just resigned. He's been here for 8 years and basically owns a bunch of messy processes around monthly reporting, billing exceptions, and CRM stuff that nobody else really touches.

We have about 6 weeks of overlap before his last day. The routine day-to-day stuff is mostly covered in checklists already, so I'm not too worried about that. What i am worried about are those potential weird one-off edge cases that only pop up once a year where if you do the standard thing it breaks downstream numbers.

ive experienced some bad cases where critical ex employees were actually depended on years after they had left that job

I'm also a bit skeptical that making him write a massive doc or record a bunch of screen shares is going to help, because in my experience nobody actually reads or watches that stuff once the person is gone.

Any pointers/dos/donts for a situation like this


r/projectmanagement • • 1d ago

Help me read & interpret organizational change around a project. Need advice!

4 Upvotes

it’s hard for me to put words to what I’ve been experiencing with a project, but I believe it’s likely an issue that’s not uncommon in project management that I’ve yet to wrap my head around and adapt to.

Firstly, I’ve been working on this project for 1.7 years now, not as a PM but as someone who designs and implements process and executes anything else that’s required. My original project lead retired, and since she’s been replaced the project has been falling apart. There are two big projects that sit under our department and the new project lead initially helped to set that one up. Unfortunately, when he switched to my project, his loyalties never shifted. Long story short, I feel like I’ve been carrying a dying project, advocated for its importance and relevance in my team, flagging process and timelines risks for being under-resourced. I’m the only continuity layer on a team of 4, and find that the momentum of the new team is non existent.

Ive been pressuring our comms person to send necessary comms to no avail, I’ve been dealing with stakeholder resistance on other teams, I’ve been escalating timeline risks to upper management because risks are not being dealt with. I have zero support from my project lead and feel like I have all the responsibility of ensuring this project is successful with zero authority. This has led to severe burnout/depression and I’m not trying to navigate the medical treatment of this, without ruining my career reputation in the process.

My project lead in a candid moment told me “I’m not cut out for this work, I have no been working on this project for months now (he’s been getting pulled back into the other one) and I’m going to talk to the director about it.” He also told me that I’ve been doing “a lot”. I deigned, built all the tooling, change management, comms, etc for a large process without any help when this type of process would typically have a team of 5 supporting it. This is just one of several processes that I’m responsible for, in various stages. Some have either already been implemented, where I only oversee end to end and continuous improvement, or am still designing from scratch with stakeholder consultations prior to formal roll out.

I’m now being asked to support with the other project on menial tasks way below my skill set and not originally in my role description because “no one else can do it” and “we don’t have that resource anymore”. And I’m getting mixed messages about my current project processes, just a couple months ago I was told “leadership believes this process is very important and it needs to get done,” to now being told “maybe this is actually not that important.” I’m not sure what’s coming from leadership vs. just a personal opinion shared in the moment.

Frankly, I don’t know what’s going on, where to be focused, how to win, or what will drive the most value for the business. And I’m having an impossible time keeping to my usual performance standards which are generally quite high. I’m at a complete loss on what to do here.

It feels like there a real leadership vacuum, and while to me it’s dead obvious there‘s a chance that the director has no idea what’s going on. I went on medical leave for 2 weeks and immediately upon my return quietly had to absorb two roles that seem to have drifted elsewhere, and no one is checking in on me. NO ONE. I don’t even know who I’m supposed to report to anymore. I know that I should not be quietly absorbing other roles, but things are changing faster than my awareness can keep up with and, as someone who is naturally high agency, it’s hard for me to see a gap and choose to not fill it.

Ive decided that this organizational culture is a terrible fit for me. I’m just trying to decide how to handle this situation to protect myself before I can exit.

Any advice?


r/projectmanagement • • 1d ago

THE Project Management tool

28 Upvotes

I am looking for a project management tool, where I have a timeline/gantt with a visual overview of every day and the calendar weeks. Then I should be able to type in and move around tasks for each day. Meetings/events, milestones and todo's should be visually diffferent. I need so assign the tasks to a person. It should be online, synced and collaborative. the status of the to dos should be changeable. Any advice?

Thanks

Lazló


r/projectmanagement • • 1d ago

Career Does a Prince2 and APM project fundamentals make sense ?

1 Upvotes

Hello everyone, I am a recent UK graduate with 6 months of project coordinator experience and was looking to get into finance project management roles. I am looking for junior roles and was wondering if these certifications are actually valuable and would give me a boost in applications.

I am also considering getting a certification from CISI for investment fundamentals but the feedback so far has been very different as some are saying go for it while others say it is not worth it. Would love to hear your experiences.


r/projectmanagement • • 2d ago

Why does the last 10% of every project take half the time?

38 Upvotes

Every project I've run has the same shape. For most of it, things look roughly on track. Progress moves, the plan holds, the status report is a comfortable shade of green. Then we hit what's supposed to be the final stretch, and it just doesn't end.

It's always the same stuff. The small fixes that came out of the last review. The edge cases nobody thought about until testing. Documentation that was supposed to be written along the way and wasn't. Handover to the client or the support team, which turns into three more meetings and a list of questions. Getting final sign-off from someone who's suddenly hard to reach.

None of it is big on its own. Together it can easily take as long as everything before it.

There's an old line in software, the ninety-ninety rule: the first 90% of the work takes 90% of the time, and the remaining 10% takes the other 90%. It's a joke, but it holds up uncomfortably well.

I think part of the problem is how we plan it. The tail usually gets one tidy line at the end of the plan, closeout or handover, with a week or two attached. All the uncertainty of the project quietly collects in that one line, so the plan looks fine right up until the moment it doesn't.

I've tried a few things. Adding explicit time for fixes after every review instead of assuming there won't be any. Making documentation part of "done" for each piece rather than a phase at the end. Treating handover as a mini-project with its own tasks. They help, but I still underestimate it almost every time.

How do you plan the end of a project? Do you budget the tail as its own phase, spread it through the work or just accept that the last stretch always runs long?


r/projectmanagement • • 1d ago

Discussion What percent of projects actually finish on schedule?

8 Upvotes

I’d probably say it’s less than 30%.

I mean even if it’s 1 month off, that’s not “on time”. That’s why I say less than 30%


r/projectmanagement • • 1d ago

New to Program Management at Smaller Scale... any advice is welcome!

3 Upvotes

Hello! I switched from manufacturing sales and program management in the lighting industry to a wellness and luxury plushie manufacturing company that is much smaller than the Corp I worked for previously. Getting our retailers to comply and submit their participation pictures has been less than a joy. People are hanging up on me. Any suggestions on how to get them active ans keeping us at the forefront of their minds, outreach methods.... all is welcome:)


r/projectmanagement • • 2d ago

Discussion Gantt dates from a dozen status decks, how do you do it?

3 Upvotes

status decks from a dozen of project teams all have a gantt and the ask is getting start dates, end dates and milestones into one tracker. every team draws the timeline differently. some by month and some by week commencing, one by fiscal quarters

the native pptx ones look doable as the bars are real shapes with positions. python pptx can read where a bar starts and ends against the axis labels and the date math needs no guessing

its the charts that got flattened or pasted in as screenshots. those probably might help if llamaparse or gemini looking at the slide image but turning a pixel position into a date on a fiscal calendar seems like where it goes wrong without anyone noticing

if anyone pulling dates from these at scale do you guys manually see each chart


r/projectmanagement • • 3d ago

Discussion Anyone else feel like the recurring process only works because you personally chase it?

23 Upvotes

I used to run a handful of recurring processes in a large organization's IT department: planning cycles, decision meetings, that kind of thing. Every cycle had the same shape. A date was set, and a bunch of people each had something to deliver at some point before it.

Building the plan was never really the hard part. The hard part was the weeks before. I wrote the same reminder emails every cycle, kept track in my head of who was behind, and slowly became the person people connected with nagging. The process worked, but mostly because I chased it.

For those of you who run something similar:

Which part would you most like to stop doing: building the plan, or chasing it?

What do you use to keep track today? A spreadsheet, calendar reminders, a ticket tool, something else?

Has anything actually reduced the chasing, or does it always come down to one person following up?

Curious how others handle it.


r/projectmanagement • • 4d ago

Is it normal for the PM role to be 60% commercial battles with contractors?

18 Upvotes

That's my experience, I hardly have any time to review technical documents, drawings, RFIs etc. Most of my time goes into dealing with variation and time claims.


r/projectmanagement • • 4d ago

Need help tracking team for DSU

8 Upvotes

There’s no scrum master on the team so that role is split between me and the TPO. I run our daily standup but for now I go through the user stories in sprint, grab an update on it and ask if they have any blockers on getting the stories completed.

In other projects I would have an Excel file that I would be given and all I had to do was assign owners to tasks and track them based on completion/milestone.

How can I track progress on the project better for my daily standup calls?


r/projectmanagement • • 4d ago

General PM that is not very articulate

24 Upvotes

Hello. If an IT PM is not very articulate on how he communicate with stakeholders, is he gonna last in this industry? He still able to deliver his projects but communication is his weakest point.

Is being able to deliver the projects on time and on budget enough? The process throughout that delivery is hard because on how the PM communicates, and misunderstood the technical terms and processes. He gets confuse as well especially if the project is new and will involve all business and critical application -- but he still able to deliver 🤷‍♀️ it's just the project team and his boss got stressed and confused

How do you improve your communication especially in IT?


r/projectmanagement • • 4d ago

General Project emails

22 Upvotes

Hey PM's - can you provide any tips , tricks, SW, Workflows in sharepoint, Excel etc. My questions revolves around getting emails from my customer for a project. They are asking for things in the email. Deliverables, Files, Documents, timelines etc. I get these emails all the time from random people at the customer. My question is what is the best way to transfer this request to some kind of tracking tool. I kind of just manually add these to a spreadsheet. This seems very 2005. I figure there has to be a better way??


r/projectmanagement • • 5d ago

ISO best practices for managing reviews in Asana (or whatever tool)

11 Upvotes

Looking for feedback on best practices when it comes to reviewing assets in Asana. Specifically how people are structuring the tasks and subtasks involved. I have more of a platform background than a project management background, so hoping to learn from people who know more.

Our typical setup looks something like this:

Parent task (e.g. landing page)

* Write Copy

* Build Page

* Approval (reviewers put their feedback in the comments of this task)

* Review (person A)

* Review (person B)

* Implement changes

* Handoff

In this structure, we expect that person A and person B will put their feedback in the comments of the subtask called "Approval." This has worked fine for years, but now with a larger team I'm getting complaints that it's too messy and confusing to have all the feedback in that Approval task. Instead, people are asking to have it within each person's review task. So like this:

Parent task (e.g. landing page)

* Task

* Task

* Approval

* Review (person A) (Person A's feedback here along with any clarifying conversations)

* Review (person B) (Person B's feedback here along with any clarifying conversations)

* Implement changes

* Handoff

To me, this seems more confusing, because now the person making the changes needs to sift through multiple tasks assigned to others and find all the feedback and dedupe overlapping feedback, and potentially have the same or slightly different conversations with different people.

Do you convert every point of feedback into a new subtask for the person making changes? If so, who is aggregating and assigning those? A project manager, I assume? And where are you housing that?

I'm open to changing our system, but I'm interested in aligning with best practice more than "what So-and-so likes." So, how do you handle reviews effectively?


r/projectmanagement • • 7d ago

If You Had Only One Document to Review, What Would It Be?

17 Upvotes

Hey project managers,

What’s the first and last thing you review every day? With so many project documents, RAID logs, action items, schedules, meeting notes, reports, etc., what’s your single source of truth for quickly understanding the overall status/ disposition and health of a project?


r/projectmanagement • • 8d ago

The most detailed plan I ever built was also the most useless one

112 Upvotes

Years ago I spent nearly three weeks building a plan for a large program. Every task estimated, every dependency mapped, people allocated down to half-days. Leadership loved it.

Three weeks into delivery, reality drifted. A supplier ran late, a client review moved, two people got pulled elsewhere. Normal stuff. But updating that plan properly took most of an afternoon each time, so I started batching changes weekly, then every other week. By month two the real plan lived on a whiteboard, and the beautiful one was basically a historical document.

A few years later I ran something similar with a much rougher plan that took a couple of minutes to change. It was less impressive and probably less accurate on day one, but people actually used it, because it was still true.

That contrast made me wonder whether a good plan is less about how accurate it is at the start and more about how cheap it is to change. Though I can see where that breaks down, in construction or regulated work the detail is often the point, and maybe my first plan failed because of the tool, not the detail.

How do you see it? Have you had a detailed plan die because keeping it current was too painful?


r/projectmanagement • • 8d ago

Career My responsibilities are growing, but I’m not sure I’m actually developing

24 Upvotes

I previously worked as a Project Management Specialist, and I’m now in a similar role, but this time focusing on IT projects.

I joined a new, larger organization, which I saw as a great opportunity for professional growth. However, I came into this role without an IT background, so there has naturally been a learning curve.

The transition has been challenging, not necessarily because I can’t handle the work, but because I often feel like I’m navigating everything on my own.

My manager doesn’t communicate directly with the team very often. Instead, he mainly communicates through our team lead, who then relays information and instructions to us.

Initially, I also struggled with feeling overlooked and somewhat ignored by my team lead.
Things have improved since then, and my team lead has gradually started relying on me and trusting me with more responsibilities.

However, there’s still something missing: structure, guidance, and feedback.

I’ve been here for three months, and not once have I had a proper one-on-one meeting, a performance discussion, or even a regular check-in to understand how I’m doing.

I’m constantly being put into new situations, assigned projects, and expected to figure things out. And I do. I take initiative, find solutions, manage situations, and get things done.

But I have no real way of knowing whether I’m approaching things correctly, where I could improve, or whether I’m meeting expectations.

There’s no defined learning path, no structured onboarding, and no clear development plan, especially considering that I’m transitioning into IT project management without a technical background.

I don’t necessarily expect someone to hold my hand or walk me through every task. I’m comfortable learning independently and taking ownership. But I do believe there’s a difference between being given autonomy and being left to figure everything out without direction.

What I find most frustrating is that I’m gaining responsibilities, but I don’t feel like I’m gaining the same level of guidance or professional development.
I want to grow into this role, understand the IT environment, become better at what I do, and know that the way I’m working aligns with the organization’s expectations.

But without feedback, communication, or mentorship, it’s difficult to measure my progress or know whether I’m actually developing.


r/projectmanagement • • 9d ago

Transformation is everywhere.

16 Upvotes

So I've been doing a bit of research on LinkedIn and "Transformation" seems very popular these days. I was looking specifically into ERP transformation.

Specifically within the ERP transformations there seems to be a call for project managers to also perform change management.

Those of you in the business transformation, ERP transformation space do you feel like it confuses your branding that people from business analyst to lean practitioners also are labeling themselves as transformation agents?


r/projectmanagement • • 9d ago

Career Freelance PM Websites

20 Upvotes

Hi! I'm considering establishing an LLC to freelance PM and test the waters. I'm curious if any contractor/freelance PMs have websites established and if so, coudl you share an example?

Absolutely not looking to copy or steal, but would love to see how other PMs market themselves

Thanks!